From civil engineering and remodeling to adaptations and maintenance.
Go to Timeline
Listed below are some of the most representative projects carried out during the indicated period.
➔ Construction of the Aero-tianguis parking lot.
➔ Construction of Ixmiquilpan station, Hgo.
➔ Remodeling and adaptation of GWY Guadalajara.
➔ Project and remodeling of the Security Area offices. Project and construction of the corporate dining room kitchen.
➔ Maintenance and Execution of the Snack area remodeling. Design and execution of the ramp expansion. A3-C Warehouse Remodeling according to the new image of Reforma Station CDMX; Pachuca, Hgo.; Civac Morelos and Cuautitlan.
➔ Remodeling and adaptation of inclusive bathrooms.
➔ Electrical Installation NLU Project.
➔ Maintenance work on Hangars: Movable walls, automatic doors, hydropneumatic system and power plant, elevator, raised floor, kitchen ducts, 200 tr. chiller pumps, etc. Maintenance on Substations A and B Hangars Construction of reinforced concrete floors in the Hangars Station maneuvering yard.
➔ Adaptation of Retail stores: La Barca and Puerto Vallarta, Jal; San Jose Iturbide, Gto; Playa del Carmen expansion, QR.
➔ Construction of CRM expansion, Macrocentro.
➔ Abbott, Astra, Roche electrical and extraction installation. Manufacturing and installation of Abbot, Novartis, MSD, Cuautipark workstations.
➔ Construction of Macro CDMX offices.
➔ Various maintenance work: Macrocentro, Tres Rios, Tultitlan, SVP Taquepark, Jal. Electrical installations, air conditioning and finishes.
➔ Construction of Uruapan Store, Mich. Includes: civil works, reinforced concrete structure, masonry, installations, finishes. With project and corporate image.
➔ Installation of pneumatic system in Cienega, Monterrey, N.L. Includes: project, calculation, civil works, structure, installations.
➔ Construction of an outdoor warehouse for the expansion of the DHU machining project.
➔ Remodeling and adaptation of the HUB area.
➔ Project and remodeling of the Security Area offices. Project and construction of the kitchen for the corporate dining room. Calculation and execution of the installation of the lightning rod and grounding system in the corporate.
➔ Design and execution of the remodeling of the Snack area.
➔ Design and execution of the remodeling of the Main Reception of the Corporate.
➔ Expansion and remodeling of the gym.
➔ Calculation and project of the main water distribution network in the Hangars corporate.
➔ Remodeling of the SLP Station. According to the new image. Project and Construction of Main Facade and 28th Street of Corporate Hangares, with finishing design with aluminum panel and ceramic with corporate image.
➔ Remodeling of Recruitment Offices Hangars Construction of bathrooms and elevator for disabled.
➔ Maintenance work Hangars: Mobile walls, automatic doors, Hydropneumatic system and Power plant, elevator, raised floor, etc.
➔ Project, management and execution of Medium voltage in stations Córdoba, Ver. and Torreon, Coahuila.
➔ Construction of reinforced concrete floors in the maneuvering yard of Oaxaca Station.
➔ Adaptation of Retail stores: Magdalena de Kino, Son.; Plaza Neza and Acolman, State of Mexico.; Bucerías, Nay.; Ameca Jal.; Puerto Morelos, QR.
➔ Construction of Energizer Bunker at SVP La Joya, State of Mexico.
➔ Electrical and extraction installation for forklifts.
➔ Macro Manufacturing and installation of workstations for Abbot.
➔ Construction of GSK offices located in Minas, CDMX.
➔ Various works in Macrocentro, Tres Rios, Tultitlan, and SVP Tlaquepark, Jal.
➔ Electrical installations, air conditioning and finishes.
➔ Construction of Palenque Store and Palenque Motos, Chiapas. Includes: Construction of foundations, civil works, reinforced concrete structure, masonry, installations and finishes. With project and corporate image.
➔ Construction of Cozumel Station, Q.R.: 250 m2 warehouse. Adaptation and expansion of SVC Centenario station, CDMX.
➔ Remodeling of Salina Cruz Station, Oax. with an office area of 350 m2 plus 650 m2, foundation, steel structure, roof, masonry, installations, etc.
➔ Remodeling of the Upper Floor of Training Rooms with an area of 350 m2 located in Hanares 540, CDMX.
➔ Management and execution of medium voltage work on track 5, Hangares and Cozumel, Q. R. Station.
➔ Adaptation work on ramps for the disabled, reconstruction of the elevator shaft and structure.
➔ Slope modification work and installation of submersible pumps for sewage at Reforma Station. Adaptation of retail stores: Tecamac and Valle de Chalco, State of Mexico; Anahuac and Insurgentes, CDMX; Autonoma, Jal.; Cozumel Q. Roo; and Tecamachalco, Pue. Includes: drywall, ceramics, air conditioning, plumbing, electrical and finishing installations.
➔ Construction of mezzanine for P&G office.
➔ Remodeling of Sherwin Williams offices with an area of 350 M2 located in building 3 Macrocentro.
➔ Remodeling of Abbot offices located in building 3 Macrocentro.
➔ Various maintenance work in Macrocentro, Tres Rios and Tultitlan. Includes: masonry, plumbing, air conditioning, electrical, voice, data, finishing, manufacturing, furniture supply, among other services.
➔ Construction of Islas Funo, ATM branch within Plazas: Sendero, Fashion Mall and Gran Patio Zaragoza, Chih. Includes: masonry, air conditioning, electrical, voice, data, security, website, ATMs, secure areas, among other services.
➔ Construction of Jacarandas Store, Oaxaca, Oax; 650 m2.
➔ Adaptation of 250 m2 at Cuautla Motorcycle Store, Mor. Includes: construction of foundation, reinforced concrete structure, masonry, installations and finishes.
➔ Remodeling of the upper floor of corporate offices with an area of 3,000 m2 located in Hangares 540, CDMX. Includes: demolitions, masonry, plumbing, air conditioning, electrical, voice, data, bathroom construction, finishes, etc.
➔ Comprehensive maintenance work at Tapachula, Chis. and Minatitlan, Veracruz stations. Includes: Civil and electrical work, finishes.
➔ Construction of bathrooms and lockers at Hanares station. Remodeling of supply offices.
➔ Office adaptation for Medtronic Nave 4 Macrocentro.
➔ Demolitions, masonry, plumbing, air conditioning, electrical, voice, data, bathroom construction, finishing, etc.
➔ Construction of a bank, Sendero branch and Plaza Platinum, Chihuahua, Chih. Includes: Masonry, plumbing, air conditioning, electrical, voice, data, security, website, ATMs, secure areas, etc.
➔ Adaptation of Fashion Market Plaza Store in Lago de Guadalupe, State of Mexico. Includes: Masonry work, plumbing, air conditioning, electrical, voice, data, security, finishing, website, etc.
➔ Adaptation of retail stores:
➀ Av. Patria y Av. Juan Pablo Segundo, Guadalajara, Jal.
➁ Av. Miguel Alemán, Cd. Obregón, Son.
➂ Papantla y Tierra Blanca Centro, Ver.
➃ Huajuapan de León Centro, Oax.
➄ Nueva España, Chih. Chih.
➅ Plaza Zeus, Irapuato, Gto
➆ Plaza Río Grande, Cd. Juarez, Chih
➔ Includes: air conditioning, plumbing, electrical installations, finishes.
➔ Maintenance work at Club Tecamachalco, State of Mexico. Includes: demolition, masonry and finishing.
➔ Remodeling of the bank branch in Cd. Madera, Chih. and Patio Tlalpan, CDMX. Includes: demolitions, masonry, plumbing, air conditioning, electrical, voice, data, security, website, ATMs, secure areas, etc.
➔ Medium Voltage Tepoztlan, Mor. branch. Includes: Civil and electrical works.
➔ Construction of pumping sumps in Reclusorio Oriente and Sur, CDMX. Includes: Excavation, reinforced concrete structure, masonry, sanitary and electrical installation. Installation of motion sensors in Building B, Blvd Adolfo Lopez Mateos 2321.
➔ Adaptation of the Fashion Market Plaza Satin store, Toluca and the Lerma Outlet. Includes: masonry work, plumbing, air conditioning, electrical, voice, data, security, finishing, website, among other services.
➔ Construcción de Tienda Omealca, y oficinas de Cobranza Lerdo, Ver. Incluye: Construcción de cimentación, estructura de concreto armado, albañilería, instalaciones y acabados.
➔ Construction of Omealca Store and Collection offices in Lerdo, Ver. Includes: Construction of foundations, reinforced concrete structure, masonry, installations and finishes.
➔ Adaptation of Cuidado con el Perro branch, Cuautla Centro. Includes: Electrical installations, Voice and Data, Security, Air Conditioning, finishes, structural steel panels, among other services.
➔ Adaptation of stores in San Juan del Rio, Qro.; Santa Lucia, CDMX and Oaxaca Centro, Oax. Includes: air conditioning, plumbing, electrical and finishing installations.
➔ Maintenance work.
➔ Construction of pavements and mezzanines for Gran Sur stores in Mexico City and San Mateo Naucalpan, State of Mexico. Includes: Casting with MR-40 concrete with polished finish.
➔ Construction of Coppel-Canada Store: Av. Texcoco, CDMX; Temixco, Mor.; Atempan, Pue.; and Chalco Centro, State of Mexico. Includes: Construction of foundations, ribbed slabs, masonry, installations and finishes.
➔ Remodeling of bank branches: Zacapoaxtla, Pue., Zona Dorada, Cd. Juarez, Chih. and Tepoztlan, Mor. Includes: masonry, installation, finishes, ATMs, secure areas, among other services.
➔ Adaptation of Cuidado con el Perro branch, Plaza Altacia and Centro in Leon, Gto., Plaza Averanda, Cuernavaca, Mor. and Optima Store, Celaya, Gto. Includes: installations, fine carpentry ceiling finishes, structural steel panels, etc.
➔ Adaptation of store in Oaxaca, Oax.
➔ Steel restructuring and adaptation in Wec/Nlu, Adaptation of miniHub.
➔ Systems and Sales in Hangares corporate, CDMX
➔ Construction of Degollado branch, Insurgentes Sur, CDMX. Includes: demolitions, earthworks, foundations, reinforced concrete structure and multi-panel steel roof, masonry, installations and finishes.
➔ Construction of Coppel-Canada Store, Juchitan, Oax.
➔ Adaptation of Coppel-Canada Store, Iztapalapa, and remodeling Cuajimalpa, CDMX.
➔ Remodeling of bank branches:
➔ Insurgentes y La Cuesta, Hipotecaria Misiones, Cd. Juarez, Chih.
➔ Sierra Madre, Cd. Cuauhtemoc and North Campus, Chih.
➔ Construction of Plaza Comercial, Farmacia Platino and Belisario II; Tuxtla Gutierrez, Chis.
➔ Construction of Clean Room for GSK, Tres Rios, State of Mexico.
➔ Adaptations in Tekal, Martín Carrera and Teotihuacan branches, State of Mexico.
➔ Adaptation of Irapuato Station, Gto.
➔ Maintenance of Cordoba Station, Ver.
➔ Adaptation of Atlixco Store, Pue. and San Andres, Tuxtla, Ver.
➔ Mini Gwy adaptation, Guadalajara, Jal.
➔ Office adaptation for Pernod, Building 4 Macrocentro.
➔ Maintenance of PepsiCo offices in the La Joya industrial park.
➔ Construction of the Abbott area, Building 3 Macrocentro.
➔ Construction of MSD offices, Building 3 Macrocentro.
➔ Construction for Biomeriux in Building 2 Macrocentro.
➔ Construction of a Bunker for Pernod, Building 4 Macrocentro.
➔ Remodeling of the Laboratory building, Teacher's Room, Library, Dining Room, Auditorium and Computer Room.
➔ Maintenance, Huixquilucan, State of Mexico.
➔ Construction of Cedis Apizaco, Tlax. Includes: construction of a 600 m2 warehouse, a 250 m2 mezzanine of offices, 1200 m2 of maneuvering yard and 500 m2.
➔ Remodeling of bank branches: Central Supply, Puebla; Nogales; Misiones, Cd. Juarez, Chih.; Napoles and Moctezuma, CDMX.
➔ Construction and Adaptation of Pharmacy: El Condor branches, State of Mexico; North Central, Tuxtla Gtz., Chis.; Alpes and La Joya, CDMX. Includes: construction of commercial premises.
➔ Maintenance of medium and low voltage installations Cedis Lerma, State of Mexico.
➔ Adaptation of Pizza Hut Restaurant, Aragon branch, CDMX.
➔ Various maintenance work in Cedis K+N, Cuautitlan, State of Mexico.
➔ Adaptation of Pharmacy: Cuauhtemoc, Costa Azul and Acapulco, Gro. branches.
➔ Adaptation of 10 Pharmacies for a makeover in Michoacan.
➔ Construction of pharmacies, Domingo Diez branch, Cuernavaca, Mor.; y Altamirano branch, Los Reyes La Paz, State of Mexico.
➔ Maintenance at Acapulco, Gro. Station; and Chihuahua, Chih. Station.
➔ Installation of medium and low voltage in Cedis Lerma, State of Mexico.
➔ Waterproofing works in Cedis Tlahuac, Vallejo, Chalco, Vallejo, Mixcoac and Los Reyes, CDMX. Medium voltage installation in Cedis, Tlahuac, CDMX.
➔ Adaptation of corporate offices in Insurgentes and Felix Cuevas, CDMX.
➔ Remodeling of bank branches: Granjas MEXICO, CDMX; y Volcanes, State of Mexico.
➔ Construction and adaptation of pharmacy branches:
➀ Juventino Rosas, Widberto Jimenez, Plaza Gaona; Av. Hidalgo Ave. adaptation, Francisco Villa, Leon, Gto.
➁ Arandas Street, Leandro Valle, Los Reyes, Las Aguilas, Francisco Sarabia and Jardines, Irapuato, Gto.
➂ Altamirano City, Gro.
➃ Diego Humatzin, Ecatepec, State of Mexico.
➄ Plaza Juárez in Historic Downtown, Tlacote, Queretaro, Qro.
➅ Tlahuac and Ailes Naucalpan, State of Mexico.
➆ Adaptation of 30 Pharmacies for a change of image in Leon Plaza, Gto. y Plaza Morelia, Mich.
➔ Manufacturing, supply and installation of integral kitchens and closets, Towers 27, 29 and 41.
➔ Supply and installation of aluminum in 32 apartments, Towers 41 and 49; Rincon de la Montana, Atizapan de Z., State of Mexico.
➔ Construction of a fast soccer field within Cedis Lerma, State of Mexico.
➔ Construction of a safety cage for psychotropic drugs Cedis Lerma, State of Mexico.
➔ Remodeling of bank branches:
➀ Montevideo and Centro Medico, D.F.
➁ Cto. Medicos and Cto. Arquitectos, Satelite Nezahualcóyotl, Chalco Plaza 200, Chalco Centro and Ayotla, en State of Mexico.
➔ Adaptation of bank branches:
➀ Plaza Brena, Oaxaca, Oax.
➁ Opening of a new branch, Tula, Hgo.
➂ Narvarte 15 y sucursal 913, Patriotismo, CDMX.
➃ 1° de Mayo 179, Naucalpan, State of Mexico.
➄ 966 Zumpango, State of Mexico.
➅ 508 Maquinita en Toluca, State of Mexico.
➔ Maintenance work at the Xochimilco and Azcapotzalco plants, CDMX.
➔ Remodeling of the employee dining room at the Xochimilco and Azcapotzalco plants, CDMX.
➔ Maintenance work at the Xochimilco and Azcapotzalco plants, CDMX.
➔ Remodeling of the employee dining room at the Xochimilco and Azcapotzalco plants, CDMX.
➔ Maintenance and construction work at Cedis Tepotzotlan, State of Mexico.
➔ Adaptations due to change of image in Hogares branch, Atizapan de Z., State of Mexico.
➔ Maintenance work at stations; Cuernavaca, Hangars and Customs Mexico.
➔ Project and execution of corporate air conditioning system for Hangars.
➔ Construction of a cafeteria for DHL employees at the Santa Fe corporate headquarters.
➔ Construction of a warehouse for GWY in the Mexico tax area, 2,700 m2.
➔ Construction of the Acoxpa, Geranios, Lago Tana and Mixcoac stations, CDMX.
➔ Construction of offices in an air market.
➔ Remodeling of Nave B to expand the Hub.
➔ Construction of a 1,400 m2 Acapulco station, Gro.
➔ Remodeling of San Antonio station for 4,000 m2 warehouse.
➔ Remodeling of 1,500 m2 warehouse, Mazatlán, Sin.
➔ Station maintenance, Silao and Queretaro.
➔ Remodeling of 1,700 m2 station. Acoxpa, D.F.
➔ Remodeling of 1,000 m2 station, Pachuca, Hgo.
➔ Retail store adaptation:
➔ Coatzacoalcos, Ver.
➔ Felix Cuevas, CDMX.
➔ Zamora, Mich.
➔ Reforma Diana, CDMX.
➔ Libertad y Trias Chihuahua, Chih.
➔ Tlaxcala, Tlax., Plaza Dunas, Chih., and Tuxtla Gutierrez, Chis.
➔ Cuauhtemoc Ave., Acapulco, Gro.
➔ Amores, Vallejo Air West, and Acoxpa, CDMX.
➔ Cedis Carrizal and Arauco Warehouse, State of Mexico.
➔ Construction of a 294 m2 Hazmat warehouse, Carrizal.
➔ Cedis Carrizal and Santa Fe corporate offices.
➔ Various electrical installation works in Warehouses 1 and 3.
➔ Construction of offices for HP.
➔ Supply and installation of emergency plants, one 250 KVA
➔ Remodeling of the systems area at the Pelícano Plant, CDMX.
➔ Remodeling of 600 m2 of corporate offices and meeting room.
➔ Expansion of parking and remodeling of staff access.
➔ Topographic and architectural survey of the plant located on Pelicano Street.
➔ Adaptation of pre-installation and maintenance area to equipment at Cedis Carrizal.
➔ Construction of training room.
➔ Adaptation of Dining Room at Corporativo Arcos.
➔ Construction of a Beneficiation Plant and Water Recovery Pool in the Tailings Dam.
➔ Construction of a Testing Laboratory.
➔ Construction of gabion retaining walls.
➔ Construction of 240 m2 of administrative offices.
➔ Construction of administrative offices and installation of medium voltage in BDF Tultitlan, State of Mexico.
➔ Drinking water line replacement Model Unit, CDMX.
➔ Construction of 1.2 km of water line with PAD pipe in Ocuilan, State of Mexico.
➔ Construction of a surface tank with a capacity of 500 m3 and a 100 m3 regulation tank at a height of 15 m located in Acolman, State of Mexico.
➔ Construction of cellular radio base in:
➀ Santiago Alseseca, Pue.
➁ Huixcolotla, Pue.
➂ Construction of cellular base radio for TELEFONICA MOVISTAR.
➃ Cuapiaxtla, Pue.
➄ San Rafael, Pue.
Some of the most representative projects carried out in previous years.
Let us advise you and carry out the construction, remodeling and maintenance that your growth requires.